Employees Working on site: Enna Buruca.
Subcontractors on site: Hilton Head Security - 3.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get plumbing, HVAC, and electric completed.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Worked on punch list. Installed security system. Clean and organize guesthouse.
Employees Working on site: None
Subcontractors on site: Ruxton Painters - 4.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Complete painting.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Prep interior for paint. Strip 2nd floor counters. Stain 2nd floor counters.
Employees Working on site: Keith McMillan, Jose Bustamonte.
Subcontractors on site: CCS HVAC - 2. Ruxton Painters - 4. Cuda Company - 2. Tim Heartile - 1.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get interior punch trim completed.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: 2nd floor HVAC up and running. 1st floor walls prepared for paint. Worked on 2nd floor trim punch. Chalk 2nd floor brick. Clean and organize job site.
Employees Working on site: Keith McMillan.
Subcontractors on site: Ruxton Painters - 4. CCS HVAC - 2. CCS Electric - 1.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get HVAC completed.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Worked on trim punch. Install new electric devices. Worked on HVAC. Prep 1st floor walls for paint. Clean and organize job site.
Employees Working on site: Keith McMillan.
Subcontractors on site: Ruxton Painter - 3.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get HVAC and electric completed.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Worked on interior trim punch. Paint 1st floor ceilings. Clean and organize job site.
Employees Working on site: Keith McMillan.
Subcontractors on site: Ruxton Painters - 3.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get interior electric and HVAC completed.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Installed 2nd floor trim. Prep for paint. Spray 1st floor trim. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder, Keith McMillan.
Subcontractors on site: CCS HVAC - 1. CCS Electric - 1. Ruxton Paint - 3.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get trim punch completed. Get HVAC completed.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Removed electrical devices. Installed 2nd floor trim. Worked on doors. Prep for paint. Worked on HVAC system. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder.
Subcontractors on site: CCS - 2.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get HVAC up and running.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Installed interior trim. Worked on interior doors. Worked on HVAC system.
Employees Working on site: Danny Tracy, Hank Felder, Jose Bustamante.
Subcontractors on site: CCS - 3.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get interior trim completed. Get HVAC installed. Get electrical contacts replaced.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Installed interior trim. Worked on interior doors. Worked on installation of HVAC. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder.
Subcontractors on site: Ricky Brown - 2.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get interior trim completed. Get HVAC installed in attic.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Installed 1st floor doors. Installed 1st floor door stop. Installed base board and shoe on 2nd floor. Installed 3/4 ply in attic. Installed 2nd floor powderroom brick counter top. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder.
Subcontractors on site: Builders 1st - 1.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get interior trim completed.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Installed shoe molding on 1st floor. Install flooring protection. Insulate attic area. Mortis 1st floor door hinges. Installed 2nd floor SYP. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder.
Subcontractors on site: None
Visitors: No visitors today
Equipment Used: none
Urgent Items and Equipment Needed: Get interior trim completed. Get electrical fixtures removed, cleaned, and re-installed. Get HVAC up and running on 2nd floor.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Installed flooring protection. Installed shoe molding on 1st floor. Clean and organize job site.
Employees Working on site: None
Subcontractors on site: None
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get floors finished!
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Clean and organize job site. Count electrical devices.
Employees Working on site: None
Subcontractors on site: Timber - 3.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get floors finished.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Sanded and screened floors.
Employees Working on site: None
Subcontractors on site: Timber - 4.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get floors finished. Find wall paper for baths.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Cut in and installed floor vents in bunkroom. Sanded floors.
Employees Working on site: Danny Tracy.
Subcontractors on site: CCS HVAC - 2. Timberland - 3.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get flooring delivered.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Installed bath cabinets. Installed bath counter tops. Removed fire damaged materials. Worked on attic HVAC duct. Sanded floors.
Employees Working on site: None
Subcontractors on site: Timberland - 2. MMC -2.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get flooring installed in Bunkroom.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Install kitchen counter tops. Worked on installing powder room cabinet. Sand floors.
Employees Working on site: Danny Tracy, Hank Felder.
Subcontractors on site: Timberstone - 4.
Visitors: Insurance agent
Equipment Used: None
Urgent Items and Equipment Needed: Get fire damage corrected.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Rough in attic HVAC. Start installing flooring. Start refinshing flooring. Installed HVAC grills in 1st floor. Remove Fire damaged materials.
Employees Working on site: None
Subcontractors on site: MMC - 1.
Visitors: No visitors today
Equipment Used: None.
Urgent Items and Equipment Needed: Get fire damaged replaced.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Fabricated new heart pine grills for 1st floor HVAC.
Employees Working on site: None
Subcontractors on site: CCS HVAC - 2. Ruxton Painting - 3.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get Fire damage repaired. Get materials ordered.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Worked on trouble shooting 1st and 2nd floor HVAC system. Sand interior paneling and seal. Clean and organize job site.
Employees Working on site: None
Subcontractors on site: Ruxton Painting - 4.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get fire damage repaired. Get materials ordered.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Seal walls, ceilings, and trim. Clean and organize job site.
Employees Working on site: None
Subcontractors on site: Ruxton Painting - 4.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get fire damage repaired. Order HVAC replacement.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Prepare for sealing walls, ceilings, and trim.
Employees Working on site: None
Subcontractors on site: Service Masters - 3. Ruxton Painting - 4.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get fire damage cleaned up. Get materials ordered.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Re-mask windows and re-prep for sealing walls and trim. Clean fire damage. Soot-seal attic and crawlspace. Clean and organize job site.
Employees Working on site: Enna Buruca.
Subcontractors on site: Service Masters - 3.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get fire damaged cleaned up.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Clean tile and grout with bleach. Clean and organize job site from fire. Clean fire damage.
Employees Working on site: None
Subcontractors on site: Service Masters - 3.
Visitors: No visitors today
Equipment Used: None.
Urgent Items and Equipment Needed: Get fire damage cleaned and repared.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Remove fire damaged materials. Clean fire damage.
Memo:
Thru out powder room exhaust vent, 4 - 4'x8' dow board, Rason paper, 2 - 6'x12' drop clothes, and entry welcome mat.
Employees Working on site: Enna Buruca.
Subcontractors on site: Service Master - 3.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get fire damage repared. Get new flooring material ordered. Get New HVAC system installed.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Removed fire damaged materials from house. Clean fire damage.
Employees Working on site: Enna Buruca.
Subcontractors on site: Service Master - 4.
Visitors: No visitors today
Equipment Used: none
Urgent Items and Equipment Needed: Get fire damage repared.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Removed fire damaged material from home. Cleaned fire damage.
Memo:
I thru out three 6'x 12' drop clothes on 02/12/07 due to the fire damage.
Employees Working on site: Enna Buruca.
Subcontractors on site: None
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get fire damage repared.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Replace bunkroom floor joist and sub-floor. Remove insulation from attic. Remove HVAC duct from the attic. clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder, Jose Bustamante.
Subcontractors on site: None
Visitors: No visitors today
Equipment Used: none
Urgent Items and Equipment Needed: Get fire damage repared.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Removed heart pine flooring. Removed bunkroom sub-floor. Removed bunkroom floor joist. Clean and organize job site.
Employees Working on site: None
Subcontractors on site: None
Visitors: No visitors today
Equipment Used: none
Urgent Items and Equipment Needed: Restore house.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Fire damage.
Employees Working on site: None
Subcontractors on site: Timberstone - 4.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get flooring finished.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Worked on kitchen plumbing. Worked on kitchen electric. Worked on kitchen cabinets. Floor sanding started over. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder, Jose Bustamante.
Subcontractors on site: Timberland Flooring - 3.
Visitors: No visitors today
Equipment Used: none
Urgent Items and Equipment Needed: Get cabinets
Possible Change Order Items: n/a
Work Completed or Work in Progress notes: Worked on punch trim. Clean out 2nd floor. Seal heart pine floors. Sand floors. Clean and organize job site.
Employees Working on site: Hank Felder, Jose Bustamante.
Subcontractors on site: Timberland Flooring - 2. CCS HVAC - 2.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get cabinets.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Worked on punch trim. Sanded floors. Worked on 2nd floor HVAC. Clean and organize job site.
Employees Working on site: Hank Felder, Jose Bustamante.
Subcontractors on site: Timberland Flooring - 2.
Visitors: No visitors today
Equipment Used: None.
Urgent Items and Equipment Needed: Get cabinets.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Worked on punch trim. Floor sanding started today. Remove materials from job site. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder, Billy Bowers, Walter Walden.
Subcontractors on site: Ricky Brown - 5.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get kitchen cabinets.
Possible Change Order Items: None
Work Completed or Work in Progress notes: Finished installation of heart pine flooring. Worked on punch trim. Brick was installed in kitchen and powder room. Clean and organize job site.
Employees Working on site: Hank Felder, Billy Bowers, Walter Walden.
Subcontractors on site: None
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get brick floor finished.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Installed heart pine flooring. Worked on punch trim. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder, Billy Bowers,
Subcontractors on site: none
Visitors: No visitors today
Equipment Used: none
Urgent Items and Equipment Needed: none
Possible Change Order Items: n/a
Work Completed or Work in Progress notes: Installed heart pine flooring. Worked on punch trim. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder, Jose Bustamante, Billy Bowers, Walter Walden.
Subcontractors on site: None
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get kitchen cabinets.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Installed heart pine flooring. Install trim in 1st floor bathrooms. Start punch trim. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder, Jose Bustamante, Billy Bowers.
Subcontractors on site: Ricky Brown - 4.
Visitors: No visitors today
Equipment Used: none
Urgent Items and Equipment Needed: Get kitchen cabinets.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Installed flooring. Installed bathroom cabinets. Installed bathroom base board. Installed kitchen and powerroom brick. Clean and organize job site.
Employees Working on site: Hank Felder, Jose Bustamante, Billy Bowers.
Subcontractors on site: Tim the tile man - 2.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get cabinets installed.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Worked on skirt and mob boards. Heart Pine flooring was delievered today. Started flooring installation. Grouted bathroom tile. Clean and organize job site.
Employees Working on site: Hank Felder, Jose Bustamante, Billy Bowers.
Subcontractors on site: Ruxton Painting - 4.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get brick floor installed.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Worked on stair mop and skirt boards. Worked on 2nd floor trim. Prep 1st floor for flooring. Paint trim. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder, Billy Bowers.
Subcontractors on site: CCS Plumber - 1.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get HVAC up and running.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Installed final beam in 2nd floor. Installed 2nd floor trim. Levelled bathroom floor. Installed durock in 1st floor bathrooms. Fixed water line. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder.
Subcontractors on site: CCS Electrician - 1.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: None
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Installed 2nd floor trim. Install Durock on bathroom floor. Pick up material from mill shop. Hook up water heater electric. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder.
Subcontractors on site: CCS Plumber - 1. Ruxton Painting - 6.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: None
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Prepare for painting. Install 2nd floor trim. Fix copper water line. Clean and organize job site.
Employees Working on site: Danny Tracy.
Subcontractors on site: Ruxton Painting - 6.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: None
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Installed trim on 2nd floor. Prep 1st floor for paint. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder.
Subcontractors on site: Ruxton Painting - 6.
Visitors: No visitors today
Equipment Used: none
Urgent Items and Equipment Needed: Get kitchen cabinets to job site.
Possible Change Order Items: n/a
Work Completed or Work in Progress notes: Worked on 1st and 2nd floor trim. Prep for paint. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder.
Subcontractors on site: Ruxton Painting - 3.
Visitors: No visitors today
Equipment Used: none
Urgent Items and Equipment Needed: Get cabinets delivered.
Possible Change Order Items: n/A
Work Completed or Work in Progress notes: Trim out 2nd floor ceilings. Installed paneling. Prep 1st floor for trim. Clean and organize trim.
Employees Working on site: Danny Tracy, Hank Felder, Jose Bustamante, Nicolas Rojas.
Subcontractors on site: Ruxton Painting - 4.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: None
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Worked on bookcases. Installed trim on 1st floor. Installed trim on 2nd floor. Primed sheetrock. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder.
Subcontractors on site: None
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: None
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Worked on 1st floor trim. Installed 1st floor doors. Worked on 2nd floor book cases. Clean and organized job site.
Employees Working on site: Danny Tracy, Hank Felder.
Subcontractors on site: None
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: None
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Worked on bookcases. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder.
Subcontractors on site: CCS - 3.
Visitors: No visitors today
Equipment Used: none
Urgent Items and Equipment Needed: None
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Worked on 1st floor base board. Worked on bookcases. CCS worked on HVAC units. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder, Jose Bustamante, Nicolas Rojas.
Subcontractors on site: CCS - 2.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: None
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Installed base board on 1st floor. Sanded 1st floor door jambs. CCS worked on HVAC system. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder, Jose Bustamante, Nicolas Rojas.
Subcontractors on site: CCS - 1.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: None
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Worked on book cases. Started 1st floor trim. Sand 1st floor door jambs. CCS worked on HVAC. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder, Jose Bustamante, Nicolas Rojas.
Subcontractors on site: H&H Drywall Service - 2.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: None
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Installed beams. Installed durrock. Sanded 1st floor door jambs. Fabricate book case parts. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder, Nicolas Rojas.
Subcontractors on site: H&H Drywall Service - 2.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: None
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Sanded out drywall. Installed beams in 2nd floor ceiling. Installed membrane in showers. Worked on book cases. Hooked up attic HVAC return. Clean debrie from bathroom floors. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder, Nicolas Rojas.
Subcontractors on site: None
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get mason and floor finisher.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Picked up beam material from shop. Worked on bookshelve bases. Clean debrie from bathroom floors. Installed beams in 2nd floor ceiling. Worked on panelling punch. Delivered material to shop for milling. Clean and organized job site.
Employees Working on site: Danny Tracy, Hank Felder, Nicolas Rojas.
Subcontractors on site: CCS - 1. H&H Drywall Service - 2.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get brick layer and floor finisher.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Finished installing wall panelling. Started working on book shelve bases. Completed built in display. Completed water heater tie-in. Float drywall. Clean debrie from bathroom floors. Poplar trim delievery arrived. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder, Nicolas Rojas.
Subcontractors on site: CCS - 1.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get mason and floor finisher.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Installed panelling on 2nd floor walls. Scraped floors. Installed water heaters in attic. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder, Nicolas Rojas.
Subcontractors on site: H&H Drywall Service - 2.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Contract floor finisher and brick installer.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Installed panelling. Install interior trim on 2nd floor. Finish HVAC duct insulation. Finish drywall. NOTE: Waste Manegement hit and busted main water supply.
Employees Working on site: Danny Tracy, Hank Felder, Nicolas Rojas.
Subcontractors on site: H&H Drywall Service - 6.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get mason and floor finisher set up.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Worked on wall panelling. Shimmed 2nd floor bathroom wall. Installed luan on bathroom wall. Started fabricating cabinet. Worked on HVAC trunk lines in attic. Installed drywall, and started finishing. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder, Nicolas Rojas.
Subcontractors on site: None
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get floor finishing contractor and mason lined up.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Installed wall panelling. Worked on HVAC duct. Remove water heater from attic. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder, Jose Bustamante, Nicolas Rojas.
Subcontractors on site: None
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get mason for brick installation.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Installed wall panelling. Worked on insulating HVAC trunk lines. Insulate attic. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder, Jose Bustamante, Nicolas Rojas.
Subcontractors on site: None
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: Get drywall installed.
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Installed panelling on 2nd floor ceiling and walls. Worked on HVAC trunk and supplies in attic. Called in insulation inspection for Monday. Clean and organized job site.
Employees Working on site: Danny Tracy, Hank Felder, Jose Bustamante, Nicolas Rojas.
Subcontractors on site: Gale Contracting Service - 3.
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: None
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Installed panelling on 2nd floor walls and ceiling. Fur down 45 walls. Connected attic HVAC trunks and supplies. Cleaned glue from interior framing. Clean and organized job site.
Employees Working on site: Danny Tracy, Hank Felder, Jose Bustamante, Nicolas Rojas.
Subcontractors on site: None
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: None
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Fire chalk voids in bottom and top plates. Install coax and date line boxes. Clean interior framing of glue. Installed panelling in 2nd floor ceiling. Clean and organized job site.
Employees Working on site: Danny Tracy, Hank Felder, Jose Bustamante, Nicolas Rojas.
Subcontractors on site: None
Visitors: Wood Tech. SYP delivery
Equipment Used: None
Urgent Items and Equipment Needed: None
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Removed glue from interior framing. Installed plywood on 2nd floor walls. Unload SYP delivery. Prep for SYP panelling installation. Worked on attic HVAC duct. Clean and organize job site.
Employees Working on site: Danny Tracy, Hank Felder, Nicholas Rowez.
Subcontractors on site: None
Visitors: No visitors today
Equipment Used: None
Urgent Items and Equipment Needed: None
Possible Change Order Items: N/A
Work Completed or Work in Progress notes: Shimmed walls. Installed sheathing on walls. Installed HVAC boots. Clean glue from 1st floor studs. Clean and organize job site.
Memo:
test - SHAWn
Employees Working on site: TEST
Subcontractors on site: TEST
Visitors: No visitors today
Equipment Used: TEST
Urgent Items and Equipment Needed: TEST
Possible Change Order Items: TEST
Work Completed or Work in Progress notes: TEST
Employees Working on site: TEST
Subcontractors on site: TEST
Visitors: No visitors today
Equipment Used: TEST
Urgent Items and Equipment Needed: TEST
Possible Change Order Items: TEST
Work Completed or Work in Progress notes: TEST
Memo:
Test
Memo:
Test